Two items account for most furniture assembly work in a Port Elizabeth house: the main bedroom wardrobe and the bed. One is the tallest thing you will build in a home and the other carries the most load per joint. They fail in different ways, and both are worth knowing before the boxes come out of the car.
The wardrobe
A two door wardrobe is a box, a back panel and two doors hanging off it. Simple in the drawing, awkward in a bedroom, because the panels are long, heavy and have to be held square while someone else fixes them.
Our published range is R500 to R1,100 for a two door wardrobe, with one and a half to two hours on site. Where the job goes past that:
The room. A wardrobe needs floor space to lay panels flat. If the bedroom still has the old unit in it, or the bed has not been moved, the job takes longer and the panels take more knocks.
The ceiling. A tall unit has to be stood up at the end, and it needs the height to do it. A 2.1 metre wardrobe in a room with a low ceiling and a light fitting in the middle is a genuinely awkward lift, and it is better known before the build than during it.
The doorway. Getting a built wardrobe into a room is not possible if the door opening is narrower than the unit. Assembly happens in the room for that reason, which means the flat packs go in first and the unit gets built around the space.
The floor. A wardrobe standing on an uneven floor will have doors that never line up, no matter how carefully the frame was built. Levelling under one corner takes a minute and saves the whole job.
The bed
A bed base and headboard is R400 to R900 and takes an hour to ninety minutes. It is the job most likely to be attempted first and abandoned, because it looks like four bolts and a slat pack.
What makes it more than that: the headboard fixing, which has to go into a wall or into a frame depending on the design, and which is where a cheap assembly fails the first time someone leans back. The slat base, which has to be evenly loaded or the centre rail sags. And the fittings, which on a bed take more repeated load than any other item of furniture in the house.
A bed that creaks after six weeks is almost always a joint that was never fully seated, not a manufacturer fault.
The supplied allen key is the other thing that matters here. It works, and it will take twice as long and leave your hands sore. A driver with a clutch set low does the same job in a third of the time without crushing a single panel.
The four failures worth knowing
- Cam locks crushed by over-tightening. The cam pulls the bolt and then keeps turning, crushing the board around it. Hand tight, then a quarter turn, and if it spins afterwards the panel is damaged.
- Chipboard tear-out. The same failure that takes a cupboard hinge out of a kitchen door, caused by dragging a loaded unit instead of lifting it, or loading a shelf before the back panel is fixed.
- A panel fitted face-in. Flat packs are handed. This is why a build sometimes has to be stripped to the frame and started again, and it is the most common reason a job runs over its quoted time.
- Missing fixings. Manufacturers substitute parts and bags come up short. Check the bag against the parts list before starting, not halfway up.
Rescuing a half-built unit
This is a normal booking, not an embarrassment. What matters is which failure stopped the build.
A crushed cam housing or a torn hinge-plate hole is repairable with an insert and adhesive, the same repair we do on kitchen cupboards. A back panel that was nailed on out of square can usually be released and refixed. A panel drilled wrong at the factory needs a replacement from the supplier, and being told that on the day is better than three hours of trying to force it.
Bring the instructions if you still have them. A parts list is what turns a rescue from guesswork into a job.
Wall anchoring
Any unit taller than about a metre should be anchored, and a wardrobe is the obvious case. Open both doors and the load moves forward. A child climbing a drawer does the same thing faster.
The fixing depends on the wall. Brick takes a sleeve anchor or a heavy-duty plug. Plasterboard on studs needs a fixing into the stud or a proper cavity anchor. The hollow block common in older Port Elizabeth homes is its own case, and it is the one where a plastic plug in a hurry ends badly.
This is where a single visit pays for itself twice: assembly and anchoring in one trip, with the right fixing for the wall that is actually there.
Cots, bunks and the anchoring question
Two items in a family home need more care than the rest and both are assembly jobs.
A cot is not a furniture job, it is a safety item. Every fixing has to be fully seated, the base height has to be set for the age of the child, and nothing can be left loose. If a cot has been assembled and taken apart twice, the fixings are the part to check, because a cam that has been over-tightened once will not hold as well the second time.
Bunk beds are the same question in a bigger format. A bunk bed must be anchored to the wall, and the top bunk needs a proper rail. Manufacturers supply the fixings for it. What fails is the wall: a hollow block or a plasterboard partition will not hold a bunk bed on the fixings in the box, and that is the point where the job needs a different anchor rather than more force.
Neither of these is a place to improvise. If a unit is going to have a child on it, the anchoring and the fixings are the whole job.
When replacing beats rescuing
There is a point where assembly stops making sense, and it is usually the third move.
A flat pack unit that has been assembled, dismantled and reassembled carries damage at every joint. The cam housings are loose, the screw holes are enlarged, and the back panel has been nailed twice. It will go together, and it will not stay square.
The honest test is simple. If two or more panels have torn-out fixings, or the back panel will not hold its shape, replace rather than rescue. A new unit at the price of a couple of hours of labour is the better spend, and telling a customer that before the work starts is the point.
Assembly versus buying assembled
Assembled furniture costs more and arrives when it arrives. Flat pack costs less and arrives in boxes you then live around for a week.
The middle route most people take is buying the flat pack they want and having it built on delivery. It keeps the price and the choice, and removes the Saturday.
If you want to know what is in the box, what tools make it quick and the five minute check at the end, we wrote about that separately, because it is the difference between one visit and two.
What to have ready
- The boxes in the room the unit will live in, not the garage.
- The instruction sheet and the bag of fixings.
- The old unit moved out, or a plan for it.
- A note of the wall type wherever something will be anchored.
- Any brackets, straps or fittings bought separately.
If the unit has been assembled and dismantled more than twice, ask whether replacing beats rescuing before the boxes go back together.
Book it
WhatsApp 067 397 3341 with the item, the number of units and the suburb. Wardrobe, bed, chest of drawers, desk, cot, bookshelf, all quoted per item, with the price fixed before anything is opened.
Assembly is indoor work, so it is one of the few jobs in a Gqeberha November that does not care what the wind is doing.
Got a list that needs working through?
Send it on WhatsApp with a photo or two and you get a price back, before anything is booked.
Send the list